Civil Construction

Southern Expressway Stage 2

Lucas operating as a contractor to the Joint Venture consortium undertook bulk earthworks, blasting, screening mound construction, environmental earthworks and wetland construction. Shared path construction, pavement preparation. Cut to fill of 2 million tonnes of material. Preliminary earthworks commenced February 2000; Lucas’ portion of the works was in excess of $10 Million. The project covered over 12kms through built up areas.

Harbourtown – Adelaide Airport

Including the supply of approximately 150,000 tonnes of material from Southern Waste Depot at Maslins, Lucas provided the bulk fill and earthworks portion of the contract along with fire mains and common service trenches. All earthworks were undertaken under increased security conditions due to the airside nature of the works. We have undertaken numerous construction contracts for AAL.

Big W - Monarto

Contracted to construct approximately 60,000 m2 of building platform, car parks and access roads including rock excavation and stormwater contracts, concrete works, base courses and pavements. All works were performed within a very intensive construction program.

Tailings Dams HWE Iron Duke

Construction of a clay lined tailings dam of approximately 4500 ML. Work was undertaken utilizing graders, dozers, water carts, compactors and scrapers and involved bulk cut and fill work.

Burbridge Business Park Early Works

Works including roadway construction, large culvert crossings, stormwater drainage and approximately 1km of drainage channel and detention basin construction at Adelaide Airport to provide infrastructure for the newly constructed Burbridge Business Park. Works were undertaken in severe weather conditions by using articulated dump trucks and swamp dozers to complete the works on time.

The Marina Hindmarsh Island

Contracted to construct stage 7 of the Marina Hindmarsh Island, Lucas provided bulk excavation, lagoon edging and roadway construction for the next stage of sale at the Marina Hindmarsh Island.